G99 application serviceYour G99 application, prepared, submitted and chased.

When a solar or battery job needs G99, we prepare the application from your job details, submit it to the right network operator, chase it and file every reply. From £150 up to 50 kW. Approval is the network operator's decision, so we never promise it.

Book a callG98 or G99 checker
G98 and G99G98 or G99 checkerG98 notificationG99 application serviceG99 guide

What we do

Prepared, submitted, chased and filed

StepWhat happens
We check the surveyPhase, main fuse and any existing solar or battery are asked on the survey form. If a job looks like a G99, we flag it before the quote goes out.
We prepare the applicationFrom your job details and design, on the network operator's own forms.
We submit itTo the right network operator for the address.
We chase itUntil there's an answer, and we tell you when it lands.
We file itThe application, the reference and every reply go on the job, ready for your assessor.

Approval is the network operator's decision, so we never promise it. Under G99 you apply first and wait for their answer before you switch on.

When a job needs G99

The usual triggers

  • Total generation at the premises goes over 16 A per phase: 3.68 kW single phase or 11.04 kW three phase, existing kit included
  • A battery added to an existing 3.68 kW system, which usually tips it into G99
  • Equipment that isn't fully type tested

Check a job with our G98 or G99 checker →

Price

From £150

For systems up to 50 kW. From £200 over 50 kW. An add-on, only when a job needs one.

Talk to us about a G99

G98 is included

Every job, in the £149

On the paperwork service, we fill in your G98 from the job, send it to the right network operator inside the 28 days, and chase and file the reference.

All prices →

Questions installers ask

How much is a G99 application?

From £150 for systems up to 50 kW, and from £200 over 50 kW. We prepare, submit and chase it.

Do you guarantee G99 approval?

No. Approval is the network operator's decision, so we never promise it. We make sure the application is complete and chased.

Can I switch on before G99 approval?

No. Under G99 you apply first and wait for the network operator's answer before you connect.

Does a battery count towards the limit?

Yes. The limit is for all generation at the premises, including existing systems and batteries. Adding a battery to an existing 3.68 kW system will usually need a G99.

Do I need to be on the paperwork service?

Talk to us. G99 is an add-on to the paperwork service, and we'll tell you on a call what we need for your job.