New MCS scheme: apply by 18 December, be across by 31 March 2027. Get ready with MCS Switch →

Home › Installer guides › G99 with SP Energy Networks

Installer guide

G98 and G99 with SP Energy Networks: what installers need to know.

Applying to SP Energy Networks for a solar or battery job: which route, which form, and what to check first.

By Kevin Mallon, founder · Checked 24 November 2026

Short answer: SP Energy Networks uses the ENA G99 forms: A1-1 for under 50 kW, and the fast track form A1-2 for PV and storage under 3.68 kW per phase each. Larger connections use the Standard Application Form. G98 is notified within 28 days of commissioning.

Who SP Energy Networks covers

Central and southern Scotland, plus Merseyside, Cheshire, North Wales and part of Shropshire. Not sure? Check the property's postcode on the network operator's own site before you apply.

How applications go in

JobHow it goes to SP Energy Networks
G99 fast trackForm A1-2, for PV under 3.68 kW per phase and storage under 3.68 kW per phase.
G99 under 50 kWForm A1-1, including domestic jobs.
50 kW and aboveThe G99 Standard Application Form. Incomplete applications for larger schemes can be paused until everything is in.

Every GB network operator also takes low carbon applications through the Energy Networks Association's free Connect Direct platform.

Before you apply, check

  • Total generation at the property, existing solar and batteries included
  • Phase and main fuse, confirmed on the survey, not guessed
  • Inverter and battery type test details
  • Any export limitation, and how it's set
  • The MPAN and the customer's details
  • A single line diagram if it's anything but simple

Where jobs get stuck

  • ✕Missing or wrong details send the application back, and the clock stops
  • ✕Existing kit nobody mentioned changes the total
  • ✕Fitting before the answer arrives on a G99 job
  • ✕No one chasing, so the install date slips

How we take it off you

Send us the job. We'll deal with SP Energy Networks.

We prepare your G99 from the job, submit it, chase it and file every reply, from £150 up to 50 kW. G98 is included on every job with the paperwork service. We never promise approval: that's the network operator's call.

G99 application service

Related

Questions installers ask

How do I apply for G99 with SP Energy Networks?

Use SP Energy Networks's own G99 forms or the Energy Networks Association's Connect Direct platform. Small type-tested systems may qualify for the fast track.

How long do I have to send a G98 to SP Energy Networks?

Within 28 days of commissioning.

Can I fit before G99 approval?

Don't switch on until the network operator has given its answer. Book the install once you have it.

Can you do it for me?

Yes. G99 applications from £150 up to 50 kW, and G98 is included with the paperwork service.

Sources (checked 24 November 2026)

You survey and fit. We do the rest.

Quote packs, signing, handover packs and G98 on every job, in your name. Under 30 minutes of your time.

Try your first job freeBook a call with us