Home › Installer guides › G99 with SP Energy Networks
Installer guide
Applying to SP Energy Networks for a solar or battery job: which route, which form, and what to check first.
By Kevin Mallon, founder · Checked 24 November 2026
Short answer: SP Energy Networks uses the ENA G99 forms: A1-1 for under 50 kW, and the fast track form A1-2 for PV and storage under 3.68 kW per phase each. Larger connections use the Standard Application Form. G98 is notified within 28 days of commissioning.
Central and southern Scotland, plus Merseyside, Cheshire, North Wales and part of Shropshire. Not sure? Check the property's postcode on the network operator's own site before you apply.
| Job | How it goes to SP Energy Networks |
|---|---|
| G99 fast track | Form A1-2, for PV under 3.68 kW per phase and storage under 3.68 kW per phase. |
| G99 under 50 kW | Form A1-1, including domestic jobs. |
| 50 kW and above | The G99 Standard Application Form. Incomplete applications for larger schemes can be paused until everything is in. |
Every GB network operator also takes low carbon applications through the Energy Networks Association's free Connect Direct platform.
How we take it off you
Send us the job. We'll deal with SP Energy Networks.We prepare your G99 from the job, submit it, chase it and file every reply, from £150 up to 50 kW. G98 is included on every job with the paperwork service. We never promise approval: that's the network operator's call.
G99 application serviceRelated
Use SP Energy Networks's own G99 forms or the Energy Networks Association's Connect Direct platform. Small type-tested systems may qualify for the fast track.
Within 28 days of commissioning.
Don't switch on until the network operator has given its answer. Book the install once you have it.
Yes. G99 applications from £150 up to 50 kW, and G98 is included with the paperwork service.
Quote packs, signing, handover packs and G98 on every job, in your name. Under 30 minutes of your time.