G98 notificationYour G98, sent within 2 working days. Every job.

Tap Job Done and we fill in your G98 from the install, send it to the right network operator within 2 working days, chase the reference and file the proof. You never touch a DNO form again. Included in the £149 a job.

Try your first job freeG98 or G99?

Included on every job

Filled in, sent, chased and filed. Done.

StepWhat happens
From your Job Done formThe G98 is filled in from what you actually fitted and your commissioning details. Nothing to retype.
Sent within 2 working daysTo the right network operator for the address, well inside the 28-day deadline.
Reference chasedWe chase the acknowledgement and put the network operator's reference on the job.
Proof filedThe notification and the reference sit in the job file, ready when your assessor asks.
Your customer coveredProof of notification goes in the handover pack, as the MCS Customer Commitment expects.

The rules

G98 in 30 seconds

  • Fit and inform: up to 16 A per phase in total at the property (3.68 kW single phase, 11.04 kW three phase), fully type tested
  • Notify within 28 days of commissioning
  • Existing solar and batteries count towards the limit. Over it, you need G99 before you fit

G98 or G99? Check a job →

Price

Included

G98 comes with every job on the paperwork service, in the £149 a job. No add-on, no per-form fee.

Try your first job free

Questions installers ask

How long do I have to send a G98?

28 days from commissioning. We send it within 2 working days of your Job Done form.

Is G98 included?

Yes. Preparing, sending, chasing and filing the G98 is part of the £149 a job.

Who signs off the G98?

You do: you authorise us on the Job Done form and confirm the install complies. We do the rest.

What if the job needs G99?

We flag it at survey, before the quote goes out. G99 applications are an add-on from £150.