Home › Installer guides › G99 with UK Power Networks

Installer guide

G98 and G99 with UK Power Networks: what installers need to know.

Applying to UK Power Networks for a solar or battery job: which route, which form, and what to check first.

By Kevin Mallon, founder · Checked 24 November 2026

Short answer: UK Power Networks takes low carbon notifications for homes and small businesses through its Smart Connect portal, for approved installers. G98 jobs are notified within 28 days of the install. Bigger systems go through the G99 fast track or a full application.

Who UK Power Networks covers

London, the South East and the East of England. Not sure? Check the property's postcode on the network operator's own site before you apply.

How applications go in

JobHow it goes to UK Power Networks
G98 and small low carbon installsSmart Connect, UK Power Networks' portal for approved installers, for installs up to 69 kVA. Notify within 28 days of the installation.
G99 fast trackSmall type-tested systems that qualify as a Small Generation Installation (SGI). UK Power Networks' guide takes you through it.
70 kVA and aboveA separate connections application portal.

Every GB network operator also takes low carbon applications through the Energy Networks Association's free Connect Direct platform.

Before you apply, check

  • Total generation at the property, existing solar and batteries included
  • Phase and main fuse, confirmed on the survey, not guessed
  • Inverter and battery type test details
  • Any export limitation, and how it's set
  • The MPAN and the customer's details
  • A single line diagram if it's anything but simple

Where jobs get stuck

  • ✕Missing or wrong details send the application back, and the clock stops
  • ✕Existing kit nobody mentioned changes the total
  • ✕Fitting before the answer arrives on a G99 job
  • ✕No one chasing, so the install date slips

How we take it off you

Send us the job. We'll deal with UK Power Networks.

We prepare your G99 from the job, submit it, chase it and file every reply, from £150 up to 50 kW. G98 is included on every job with the paperwork service. We never promise approval: that's the network operator's call.

G99 application service

Related

Questions installers ask

How do I apply for G99 with UK Power Networks?

Use UK Power Networks's own G99 forms or the Energy Networks Association's Connect Direct platform. Small type-tested systems may qualify for the fast track.

How long do I have to send a G98 to UK Power Networks?

Within 28 days of commissioning.

Can I fit before G99 approval?

Don't switch on until the network operator has given its answer. Book the install once you have it.

Can you do it for me?

Yes. G99 applications from £150 up to 50 kW, and G98 is included with the paperwork service.

Sources (checked 24 November 2026)

You survey and fit. We do the rest.

Quote packs, signing, handover packs and G98 on every job, in your name. Under 30 minutes of your time.

Try your first job freeBook a call with us