Applying to Northern Powergrid for a solar or battery job: which route, which form, and what to check first.
By Kevin Mallon, founder · Checked 24 November 2026
Short answer: Northern Powergrid publishes its G98 and G99 forms on its connections application forms page, and also takes applications through Connect Direct. G98 is notified within 28 days of commissioning; G99 jobs apply first.
The North East, Yorkshire and northern Lincolnshire. Not sure? Check the property's postcode on the network operator's own site before you apply.
| Job | How it goes to Northern Powergrid |
|---|---|
| G98, single install | G98 Form B, the single microgenerator notification, within 28 days of commissioning. |
| G98, several properties | G98 Form A, the multiple microgenerator application, before you fit. |
| G99 | Its G99 forms, from its connections application forms page, before you fit. |
Every GB network operator also takes low carbon applications through the Energy Networks Association's free Connect Direct platform.
How we take it off you
Send us the job. We'll deal with Northern Powergrid.We prepare your G99 from the job, submit it, chase it and file every reply, from £150 up to 50 kW. G98 is included on every job with the paperwork service. We never promise approval: that's the network operator's call.
G99 application serviceRelated
Use Northern Powergrid's own G99 forms or the Energy Networks Association's Connect Direct platform. Small type-tested systems may qualify for the fast track.
Within 28 days of commissioning.
Don't switch on until the network operator has given its answer. Book the install once you have it.
Yes. G99 applications from £150 up to 50 kW, and G98 is included with the paperwork service.