New MCS scheme: apply by 18 December, be across by 31 March 2027. Get ready with MCS Switch →

Home › Why installers fail MCS assessments

MCS assessments

Why solar installers fail MCS assessments.

Your installs can be spot on and you can still come away with a list of findings. A lot of them start in the paperwork: a missing record, an estimate done the wrong way, a document the customer never got. Here are the usual ones, what happens next, and how we take the risk down on every job.

6 weeksat most to fix each finding, with root cause and corrective action. Less if it's serious.
Suspendedif you miss the deadline or findings repeat. No MCS certificates for your customers while you are.
High riskafter a major finding that risks life or property: more assessments, at least five a year.

Where installers usually trip up

None of these are about bad installs. They are the things that slip when you're on a roof all day and the paperwork waits until the evening. Each one comes from what assessors check on a solar installer's job files and records.

The performance estimateNot done the MCS way, wrong inputs for the roof, or no record of which version the customer saw.We reduce the risk: every estimate done to the MCS method, dated, versioned and checked by a second person.
Documents before the contractThe customer didn't get the Customer Commitment, terms, privacy notice or cancellation form before they signed, or you can't prove they did.We reduce the risk: every pack goes out complete, and the customer confirms each document when they sign.
Commissioning and test recordsTest results, the commissioning checklist or the electrical certificate missing from the job file.We reduce the risk: the handover pack can't be finished until they're in.
The MCS certificateRaised late, or not at all, so the customer can't claim their export payments.We reduce the risk: the deadline sits on every job and is chased before it's missed.
DNO paperworkNo G98 sent, no record of it, or a job that needed a G99 switched on without one.We reduce the risk: G98 sent and filed for you; G99 jobs flagged from the survey.
Warranty and protection evidenceNo proof of the insurance-backed guarantee or financial protection for the job.We reduce the risk: it's one of the checks before a handover pack is passed.
Out-of-date certificatesTechnical Supervisor qualification, test equipment calibration, insurance or membership lapsed.We reduce the risk: every date tracked, with reminders at 30 days, 7 days and on the day.
Records you can't findQuotes, signed contracts or job files missing when the assessor asks, or not kept for long enough.We reduce the risk: every job filed and indexed the same way, ready to hand over.
ComplaintsNo complaints log, or complaints with no root cause, action or outcome recorded.We reduce the risk: complaints passed to you in writing the same working day, with a record kept.
A quality system that doesn't match how you workProcedures copied from a template, not version-controlled, or not followed on real jobs.We reduce the risk: job files that follow the same steps every time, and MCS Switch if your system needs bringing up to date.

What happens when an assessor finds something

  1. You get the finding in writing, with a deadline: six weeks at most, less if it's serious.
  2. You show the root cause and what you've changed, not just a fix for that one job.
  3. Miss the deadline or repeat it and your certification body can suspend you. While suspended you can't raise MCS certificates.
  4. A major finding that risks life or property makes you high risk: more assessments, at least five a year.
  5. If problems carry on, your certification for that technology can be withdrawn.

What's yours, and what we take off you

We're straight about this. Your installs, site safety, risk assessments and your Technical Supervisor's sign-off stay yours, and your certification body makes the decision. We don't certify anything and nobody can promise you a pass.

What we do is make sure the paperwork side of every job is complete, checked by a second person and filed the same way every time, so it isn't the reason you get a finding. That's the part that usually slips, and it's the part we do all day.

Already certified

Moving to the new scheme? Get your quality system right first.

Under the redeveloped scheme, assessments follow your risk. MCS Switch checks your quality system and documents against the new requirements and fixes what needs it, from £395. Then every job runs through our paperwork service at £149 a job.

See MCS Switch

Getting certified for the first time

Start with job files that already pass.

Hundreds of solar firms get MCS certified every year: 718 new solar PV contractors in 2024 alone. Your first assessment includes a finished install with its full job file. Run that job through us and the paperwork is done properly from day one.

See MCS Set-up

Related

Questions installers ask

What is an MCS assessment finding?

A finding (a non-conformity) is something your certification body's assessor says doesn't meet the MCS requirements. You get a deadline to fix it, and you have to show the root cause and the corrective action you've taken.

How long do I get to fix a finding?

Under the MCS Conformity Assessment Guidelines, six weeks at most for each finding, and less if it's serious. Miss the deadline, or let findings repeat, and your certification body can suspend you.

Are findings only about the installation itself?

No. Assessors check your job files, records and quality system as well as a finished install, so a job can be fitted perfectly and still raise findings on the paperwork.

Can a paperwork service guarantee I pass?

No, and be wary of anyone who says it can. Your certification body makes the decision, and your installs, site safety and Technical Supervisor are yours. What we do is make sure the paperwork side of every job is complete, checked and filed, so it isn't the reason you fail.

Does this change under the new MCS scheme?

Assessments under the redeveloped scheme are risk-based, so a poor assessment means more scrutiny afterwards. Getting your job files right matters more, not less.

Sources: MCS Conformity Assessment Guidelines, issue 1.0, January 2025; NAPIT MCS assessment guidance; MCS contractor figures for 2024 as reported by Roofing Today in 2025. Checked 23 November 2026.

You survey and fit. We do the rest.

Quote packs, signing, handover packs and G98 on every job, in your name. Under 30 minutes of your time.

Try your first job freeBook a call with us