Home › Why installers fail MCS assessments
MCS assessments
Your installs can be spot on and you can still come away with a list of findings. A lot of them start in the paperwork: a missing record, an estimate done the wrong way, a document the customer never got. Here are the usual ones, what happens next, and how we take the risk down on every job.
None of these are about bad installs. They are the things that slip when you're on a roof all day and the paperwork waits until the evening. Each one comes from what assessors check on a solar installer's job files and records.
We're straight about this. Your installs, site safety, risk assessments and your Technical Supervisor's sign-off stay yours, and your certification body makes the decision. We don't certify anything and nobody can promise you a pass.
What we do is make sure the paperwork side of every job is complete, checked by a second person and filed the same way every time, so it isn't the reason you get a finding. That's the part that usually slips, and it's the part we do all day.
Already certified
Moving to the new scheme? Get your quality system right first.Under the redeveloped scheme, assessments follow your risk. MCS Switch checks your quality system and documents against the new requirements and fixes what needs it, from £395. Then every job runs through our paperwork service at £149 a job.
See MCS SwitchGetting certified for the first time
Start with job files that already pass.Hundreds of solar firms get MCS certified every year: 718 new solar PV contractors in 2024 alone. Your first assessment includes a finished install with its full job file. Run that job through us and the paperwork is done properly from day one.
See MCS Set-upRelated
A finding (a non-conformity) is something your certification body's assessor says doesn't meet the MCS requirements. You get a deadline to fix it, and you have to show the root cause and the corrective action you've taken.
Under the MCS Conformity Assessment Guidelines, six weeks at most for each finding, and less if it's serious. Miss the deadline, or let findings repeat, and your certification body can suspend you.
No. Assessors check your job files, records and quality system as well as a finished install, so a job can be fitted perfectly and still raise findings on the paperwork.
No, and be wary of anyone who says it can. Your certification body makes the decision, and your installs, site safety and Technical Supervisor are yours. What we do is make sure the paperwork side of every job is complete, checked and filed, so it isn't the reason you fail.
Assessments under the redeveloped scheme are risk-based, so a poor assessment means more scrutiny afterwards. Getting your job files right matters more, not less.
Sources: MCS Conformity Assessment Guidelines, issue 1.0, January 2025; NAPIT MCS assessment guidance; MCS contractor figures for 2024 as reported by Roofing Today in 2025. Checked 23 November 2026.