New MCS scheme: apply by 18 December, be across by 31 March 2027. Get ready with MCS Switch →

Home › Installer guides › Plug-in solar and installers

Installer guide

Plug-in solar is coming. What it means for installers.

In August 2026 Ofgem approved a change to G98 so plug-in solar panels can connect to the low voltage network. Customers will ask you about them. Here's what was decided.

By Kevin Mallon, founder · Checked 21 November 2026

What was approved

  • Plug-in solar PV devices that meet the government's interim product specification can connect.
  • 800 W or less registered capacity, and one device per customer installation.
  • Battery storage isn't included.
  • Customers still notify the DNO when one is installed or removed, through simplified forms, with a digital route being developed.
  • It takes effect when the government's changes to the plugs and sockets and electricity safety regulations come into force.

What it means for you

An 800 W plug-in panel is no threat to a proper rooftop system with a battery. It is a reason for a homeowner to start thinking about solar, and a reason for them to call you. Two things to watch:

  • It counts as generation at the premises. If a customer already has one, ask at survey: it's part of the G98 picture.
  • Have an answer ready. "It's a good start. Here's what a full system and battery would do for your bills" is a better conversation than "don't bother".

How we take it off you

Survey questions already cover it.

Our survey form asks about any existing generation at the property, so plug-in panels get counted before the quote and the DNO paperwork.

G98 and G99, handled

Related

Questions installers ask

Is plug-in solar legal in the UK?

Ofgem approved a change to G98 in August 2026 to allow plug-in solar devices of 800 W or less, one per home, meeting the government's interim product specification. It takes effect when related safety regulation changes come into force.

Do plug-in solar panels need a DNO notification?

Yes. Customers notify their DNO when a device is installed or removed, using simplified forms.

Sources (checked 21 November 2026)

You survey and fit. We do the rest.

Quote packs, signing, handover packs and G98 on every job, in your name. Under 30 minutes of your time.

Try your first job freeBook a call with us